Gartnavel Infrastructure Upgrade, Glasgow
Client: NHS Greater Glasgow and Clyde
Location: Glasgow
Value:
Status: Complete
Davie and McCulloch were appointed to carry out the design for the new site-wide infrastructure upgrade at the Gartnavel Hospital site in Glasgow.
The works comprised upgrades of the site HV power network, water, gas and comms infrastructure. A new HV primary sub-station building was formed on the south east corner of the site, which provides power to all buildings on the site.
As the site was fully operational 24/7, the works had to be designed and planned to minimise disruption and downtime as far as possible.